Site preparation and underground servicing for the new Port Coquitlam Multi-Sport Facility. Richco has been awarded to deliver bulk earthworks, full storm, sanitary, and water servicing, and electrical infrastructure to establish base grades and utilities for a future surface-works phase, to be completed on a 40 working day schedule.

Richco has been awarded the site preparation and servicing phase for the City of Port Coquitlam Multi-Sport Facility, the foundational stage of a larger multi-phase development. The scope will establish rough grades and the complete underground utility network required to support subsequent surface works delivered under a separate contract.

Work will begin with site mobilization, traffic control, and erosion and sediment control, followed by clearing and grubbing, topsoil stripping and stockpiling, and disposal of unsuitable materials. Bulk earthworks will include cut and fill operations to achieve rough grade across the site, along with subgrade preparation, proof rolling, and removal and replacement of unsuitable subgrade material.

Servicing scope covers storm drainage (storm piping, catch basins, manholes, channel construction, storm treatment, and detention), sanitary sewer piping with manholes and tie-ins to existing municipal infrastructure, and water servicing including watermain, valves, fittings, and restraints. Service stubs and provisions will be installed for future connections. The electrical scope includes conduit installation and the supply, installation, and commissioning of pole-mounted luminaires complete with poles, bases, wiring, and connections.

Throughout the work, Richco will coordinate grading and service elevations to accommodate the follow-on surface contractor, leaving the site stabilized, drained, and ready for finish grading, paving, concrete works, and landscaping under the next phase.

Scope Highlights


  • Full site preparation including clearing, grubbing, topsoil management, and bulk cut-and-fill earthworks to rough grade
  • Complete storm drainage system with piping, catch basins, manholes, channel construction, storm treatment, and detention
  • Sanitary and water servicing including sewer piping, manholes, watermain, valves, fittings, and tie-ins to existing municipal infrastructure
  • Electrical infrastructure including conduit installation and commissioning of pole-mounted LED luminaires
  • Grade and service elevations coordinated to accommodate a separate follow-on surface-works contract

Project Team


Wayne Van Geel
Project Manager

Wade Belair
Superintendent

Clay Crawford
Site Supervisor

    Project Details


    Project Owner

    City of Port Coquitlam


    Project Location

    Port Coquitlam


    Status

    Active

      Category


      • Excavation
      • Municipal
      • Site Preparation
      • Underground Utilities
      • Utility Crossing